Pharmaceutical Load Sharing Installation | Case Studies
Astra Zenica is one of the world’s leading pharmaceutical companies. There are approximately 1,200 co-workers in Lund, working with research and development of new medicines and medical aids used in the battle against respiratory disorders.The Caterpillar dealer of Sweden, Pon Power AB, were commissioned to provide emergency power back-up with automatic mains failure detection for the research plant, and Pon Power came to DSE distributor Jo´s Marin for the control solution. Gensets...
https://www.deepseaelectronics.com/casestudies/30/pharmaceutical-load-sharing-installationVattenfall Back-Up Load Sharing Project | Case Studies
Government owned Swedish energy company, Vattenfall, needed a reliable back-up power supply to ensure 24 hour operation of 3 of the biggest hydro-power plants in the north of Sweden.DSEs distributor Jo’s Marin & Industrielektriska AB, won the contract to provide 7 Volvo Gensets 1642, 450 Kva, each one fitted with a DSE5520 module to provide auto start on detection of a mains failure. The modules also give sophisticated monitoring and control of the engines, remote control and a soft...
https://www.deepseaelectronics.com/casestudies/32/vattenfall-back-up-load-sharing-projectHotel Load Sharing System | Case Studies
Motor Cummins, con gobernador 3044196 Generador Stamford con regulador MX 341 Módulo DSE 5520 v7, 450kW 220vCA 60HzCancún, Quintana Roo Zona Hotelera.
https://www.deepseaelectronics.com/casestudies/33/hotel-load-sharing-systemLoad Sharing & Peak Shaving System | Case Studies
Motor Cummins KTA 19; Gobernador de velocidad 3044196 Generador Stamford; Regulador de voltaje MX341 Módulo DSE 5520 v5 220vCA, 60Hz Monterrey, Nuevo León Parque Fundidora
https://www.deepseaelectronics.com/casestudies/35/load-sharing-peak-shaving-systemIron Ore Mine Remote Power Project | Case Studies
Hidden away in the South Eastern corner of Guinea is an impressive mountain called Nimba. Because of its remoteness and the steep slopes the area has not been affected by human strife. A large portion of the mountain has rich iron ore deposits and BHP Billiton along with the local mining organisation of SFMG has the rights to extract the ore. A site has been built on the western slopes to accommodate the personal involved in the mining operations.No utility power is available and diesel...
https://www.deepseaelectronics.com/casestudies/17/iron-ore-mine-remote-power-projectEuropean Rental Power Generation Problem Solved | Case Studies
Energyst Rental Solutions is a pan-European company providing turnkey rental solutions for power generation and temperature control (air/liquid heating and cooling).Jo’s Marin were commissioned to solve an installation problem Energyst were having with some rental applications. They needed a control solution that could handle their XQ Series gensets, previoulsy controlled by Woodward EGCP-2 panels. The problem was solved by using the DSE530 module.The system provides automatic mains...
https://www.deepseaelectronics.com/casestudies/31/european-rental-power-generation-problem-solvedUK Emergency Back-up Support | Case Studies
Reliability at Crucial Times.Huddersfield Royal Infirmary and other NHS hospitals throughout the UK choose DSE Auto Start and DSE Auto Transfer Switch & Mains Control modules to support life-critical hospital services.
https://www.deepseaelectronics.com/casestudies/36/uk-emergency-back-up-supportUK Emergency Back-up Support | Case Studies | DSEAts
Reliability at Crucial Times.Huddersfield Royal Infirmary and other NHS hospitals throughout the UK choose DSE Auto Start and DSE Auto Transfer Switch & Mains Control modules to support life-critical hospital services.
https://www.deepseaelectronics.com/ats/casestudies/36/uk-emergency-back-up-support/36/uk-emergency-back-up-supportAuto Transfer Switch System | Case Studies
The system utilised 2 x load sharing generators, controlled by DSE8610s, which were installed into the basement of the apartment block. Each floor of the building was then connected to a DSE333 ATS Controller which controlled the load transfer to and from the generator supply. Using this system applied the load in steps as each floor was transferred. This would avoid a potential step load that may be too large and likely to be in excess of the load acceptance specification of the gensets,...
https://www.deepseaelectronics.com/casestudies/37/auto-transfer-switch-systemAuto Transfer Switch System | Case Studies | DSEAts
The system utilised 2 x load sharing generators, controlled by DSE8610s, which were installed into the basement of the apartment block. Each floor of the building was then connected to a DSE333 ATS Controller which controlled the load transfer to and from the generator supply. Using this system applied the load in steps as each floor was transferred. This would avoid a potential step load that may be too large and likely to be in excess of the load acceptance specification of the gensets,...
https://www.deepseaelectronics.com/ats/casestudies/37/auto-transfer-switch-system/37/auto-transfer-switch-system